Ecuador
| Participants | |
|---|---|
| Owner | Empresa Pública Metropolitana de Agua Potable y Saneamiento | 
| Contractor | Eseico S.A | 
| Location of the Job Site | Quitumbe, Quito, Ecuador | 
| Tender | |
| Short Description of Job | Pipe jacking for gravity sewers ID 350 (OD 400 mm) and ID 500 (OD 610 mm) GRP Pipe along Avenida Guayani to the new sewage treatment plant of Quitumbe | 
| Specifications for Tenders | 1000 m guided auger boring for gravity sewers ID 350 and ID 500 with pilot tube method | 
| Alternative Methods proposed by the Constructor | Guided auger boring ID 350 and ID 500 with pilot tube method and Front Steer | 
| Ground conditions | |
| Described Ground in the Ground Report | Sand and gravel with pumice | 
| Encountered Soils | Sand and gravel with pumice | 
| Depth of Coverage | Up to 8 m | 
| Accuracy | ± 25 mm for line and grade | 
| Time for Job or Production Rate | June 2015 until November 2015 | 
| Driving Length | Up to 50 m | 
 
							