Switzerland boreholes under railway track
Client | KVA Linth |
Location and location of the construction site | Näfels |
Brief description of the building task | 2 boreholes and 30 m under railway track and creek |
Client's service description | |
Special suggestions from the contractor | Special sockets for welding under groundwater |
Description of the soil in the soil survey | In groundwater 2 m, gravel sand |
Ground encountered | Gravel with sand nests |
Tunnelling depths | 3.5 m overburden, creek 0.9 m |
Accuracy vertically and horizontally | 0,01 |
Execution time and rate of advance | 1.5 days of multi-shift operation for one drive |
Tunnelling length | 30 m |
Particularities | Drilling under railway track only outside the operating hours of the railway |

Bohrtec Gesellschaft für Bohrtechnologie mbH
Konrad-Zuse-Straße 24
D - 52477 Alsdorf
+49 (0) 2404 9881 - 0
+49 (0) 2404 9881 - 10
info