Paris house connection holes from tunnels
Client | Valentine |
Contractor | Zehnder |
Location and location of the construction site | Paris, Rue Paul-Hochard |
Brief description of the building task | 9 holes for house connections made of 1,800 mm collector, diameter of the holes 244 mm, length up to approx. 9.5 m, final pipe PP 200 mm |
Client's service description | Drilling in marl, partly under groundwater |
Special suggestions from the contractor | BM150DT with screw tubes, normal drill head and down-the-hole hammer for any stones |
Description of the soil in the soil survey | In groundwater 2 m, marl, clay and limestone |
Ground encountered | Marl, clay, gravel and limestone, partly in groundwater |
Tunnelling depths | 10 m overburden |
Accuracy vertically and horizontally | 0,01 |
Execution time and rate of advance | 6 weeks with all relocation work |
Tunnelling length | Max. 9.5 m |
Particularities | Drilling under busy road |