Paris house connection holes from tunnels

ClientValentine
ContractorZehnder
Location and location of the construction siteParis, Rue Paul-Hochard
Brief description of the building task9 holes for house connections made of 1,800 mm collector, diameter of the holes 244 mm, length up to approx. 9.5 m, final pipe PP 200 mm
Client's service description Drilling in marl, partly under groundwater
Special suggestions from the contractor BM150DT with screw tubes, normal drill head and down-the-hole hammer for any stones
Description of the soil in the soil surveyIn groundwater 2 m, marl, clay and limestone
Ground encounteredMarl, clay, gravel and limestone, partly in groundwater
Tunnelling depths10 m overburden
Accuracy vertically and horizontally0,01
Execution time and rate of advance 6 weeks with all relocation work
Tunnelling lengthMax. 9.5 m
ParticularitiesDrilling under busy road

Bohrtec Gesellschaft für Bohrtechnologie mbH
Konrad-Zuse-Straße 24
D - 52477 Alsdorf
+49 (0) 2404 9881 - 0
+49 (0) 2404 9881 - 10
info